Community
East Fairview Industrial building permits
East Fairview Industrial is listed in the City of Calgary open data as EAST FAIRVIEW INDUSTRIAL (community code EFV). The sections below are calculated from the permit rows stored under that name.
East Fairview Industrial has 61 building permit records in CalgaryPermit's copy of the City of Calgary Building Permits open data. 38 have an issued date and 23 do not. These figures describe the rows stored on this site, not an official citywide total. The earliest applied date stored for this community is 1999-08-18 and the latest is 2026-10-23.
In the stored rows, the most common permit type label is Commercial / Multi Family Project (61 records), and the most common work class is Alteration (39 records). Permit type is the City's project category. Work class says whether the job is new construction, an alteration, an addition, a repair, a demolition, or another label the feed uses. Read both with the permit class and the description on each record. A type label alone does not say whether the City has issued the permit.
An estimated project cost is filled in on 39 of 61 stored permits. The average of those reported estimates is $346,484.05 and the sum is $13,512,877.95. The City publishes estprojectcost as an estimate attached to the application. It is not a contract price, a final invoice, or a City assessment, and permits with a blank estimate are left out of both numbers.
Applications with an applied date in the last 12 months: 22. Applications with an applied date in the 12 months before that: 23. If the older window is small, the usual reason is that this site's copy does not go back that far for the community, not that the neighbourhood had no construction.
The contractor name published most often in this community's stored permits is ABC CONSULTING AND PROJECT MANAGEMENT, on 7 permits. A repeated name is a clue that the company appears in the open data. It is not a City ranking, a licence check, or a count of crews on site. The same firm can be spelled more than one way, and a blank contractor name means the City did not publish one on that row.
Source: City of Calgary Open Data — Building Permits (dataset c2es-76ed). CalgaryPermit stores a copy of that feed and calculates the figures on this page from that copy. The City of Calgary is the publisher of the original file.
| Label in the stored copy | Permits |
|---|---|
| Commercial / Multi Family Project | 61 |
| Label in the stored copy | Permits |
|---|---|
| Alteration | 39 |
| Temporary | 7 |
| Fire/ Security Alarm | 6 |
| New | 5 |
| Repair | 2 |
| Addition | 1 |
| Unspecified | 1 |
| Label in the stored copy | Permits |
|---|---|
| Non-Residential | 51 |
| Unspecified | 10 |
| Label in the stored copy | Permits |
|---|---|
| Issued Permit | 24 |
| Cancelled | 17 |
| Completed | 14 |
| Pending Plans Review Assignment | 4 |
| Application Received | 2 |
Reported cost estimates
39 of 61 stored permits include an estimated project cost. The average of those estimates is $346,484.05 and the sum is $13,512,877.95. Permits with a blank estimate are not in either figure.
Applications by month
Each row is the number of stored permits whose applied date falls in that month, for the last 24 months present in the copy. Applied in the last 12 months: 22. Applied in the previous 12 months: 23.
| Month | Applications |
|---|---|
| 2024-12 | 3 |
| 2025-02 | 4 |
| 2025-03 | 1 |
| 2025-04 | 2 |
| 2025-05 | 1 |
| 2025-06 | 2 |
| 2025-07 | 1 |
| 2025-08 | 6 |
| 2025-10 | 3 |
| 2025-12 | 3 |
| 2026-01 | 1 |
| 2026-02 | 4 |
| 2026-03 | 5 |
| 2026-04 | 4 |
| 2026-08 | 2 |
| 2026-09 | 2 |
| 2026-10 | 1 |
Contractor names published in this community
| Name in the open data | Permits | Latest applied date |
|---|---|---|
| ABC CONSULTING AND PROJECT MANAGEMENT | 7 | June 1, 2022 |
| FILLMORE CONSTRUCTION MANAGEMENT | 2 | May 14, 2025 |
| BEYERSBERGEN INTERIORS | 1 | December 4, 2024 |
| CENTRON CONSTRUCTION | 1 | September 4, 2026 |
| CHOICE SPECIALTY SERVICES | 1 | August 12, 2025 |
| ENGELHART CONSTRUCTION | 1 | August 27, 2025 |
| GOOD TIME PARTY RENTALS | 1 | June 9, 2006 |
| GURU RAMDAS CONSTRUCTION | 1 | July 11, 2025 |
Recent permits
| Permit | Address | Work | Applied | Issued |
|---|---|---|---|---|
| BP2026-20403 Application Received | 6810F 6 ST SE | Alteration · Commercial / Multi Family Project | October 23, 2026 | No issued date stored |
| BP2026-17024 Issued Permit | #250 8826 BLACKFOOT TR SE | Alteration · Commercial / Multi Family Project Leasehold improvement | September 4, 2026 | October 1, 2026 |
| BP2026-16782 Issued Permit | 7180 11 ST SE | Fire/ Security Alarm · Commercial / Multi Family Project Fire Alarm | September 2, 2026 | September 17, 2026 |
| BP2026-16554 Issued Permit | 8000 11 ST SE | Fire/ Security Alarm · Commercial / Multi Family Project Fire Alarm Elevator Alteration | August 31, 2026 | September 3, 2026 |
| BP2026-15172 Issued Permit | 9 HERITAGE MEADOWS WY SE | Temporary · Commercial / Multi Family Project Tier 3 Tent | August 11, 2026 | August 19, 2026 |
| BP2026-05882 Issued Permit | #860 8180 11 ST SE | Alteration · Commercial / Multi Family Project Interior alterations | April 14, 2026 | May 12, 2026 |
| BP2026-05607 Pending Plans Review Assignment | #108 8400 BLACKFOOT TR SE | Alteration · Commercial / Multi Family Project | April 9, 2026 | No issued date stored |
| BP2026-05221 Application Received | 83 HERITAGE GA SE | Alteration · Commercial / Multi Family Project | April 3, 2026 | No issued date stored |
| BP2026-05133 Issued Permit | #1160 33 HERITAGE MEADOWS WY SE | Alteration · Commercial / Multi Family Project Interior alterations | April 1, 2026 | May 12, 2026 |
| BP2026-04917 Pending Plans Review Assignment | #B 1221 73 AV SE | Alteration · Commercial / Multi Family Project | March 30, 2026 | No issued date stored |
| BP2026-04964 Issued Permit | 9 HERITAGE MEADOWS WY SE | Temporary · Commercial / Multi Family Project Special Event- The Brick May Tent | March 30, 2026 | April 6, 2026 |
| BP2026-03908 Issued Permit | 7979 11 ST SE | Alteration · Commercial / Multi Family Project Interior Alteration | March 13, 2026 | May 11, 2026 |
How to read a single row: permit fields. Back to the community index.