Highwood is listed in the City of Calgary open data as HIGHWOOD (community code HIW). The sections below are calculated from the permit rows stored under that name.
Highwood has 129 building permit records in CalgaryPermit's copy of the City of Calgary Building Permits open data. 92 have an issued date and 37 do not. These figures describe the rows stored on this site, not an official citywide total. The earliest applied date stored for this community is 2000-09-11 and the latest is 2026-10-27.
In the stored rows, the most common permit type label is Residential Improvement Project (69 records), and the most common work class is New (64 records). Permit type is the City's project category. Work class says whether the job is new construction, an alteration, an addition, a repair, a demolition, or another label the feed uses. Read both with the permit class and the description on each record. A type label alone does not say whether the City has issued the permit.
An estimated project cost is filled in on 72 of 129 stored permits. The average of those reported estimates is $211,091.46 and the sum is $15,198,585.19. The City publishes estprojectcost as an estimate attached to the application. It is not a contract price, a final invoice, or a City assessment, and permits with a blank estimate are left out of both numbers.
Applications with an applied date in the last 12 months: 33. Applications with an applied date in the 12 months before that: 54. If the older window is small, the usual reason is that this site's copy does not go back that far for the community, not that the neighbourhood had no construction.
The contractor name published most often in this community's stored permits is 2587346 AB, on 4 permits. A repeated name is a clue that the company appears in the open data. It is not a City ranking, a licence check, or a count of crews on site. The same firm can be spelled more than one way, and a blank contractor name means the City did not publish one on that row.
Source: City of Calgary Open Data — Building Permits (dataset c2es-76ed). CalgaryPermit stores a copy of that feed and calculates the figures on this page from that copy. The City of Calgary is the publisher of the original file.
| Label in the stored copy | Permits |
|---|---|
| Residential Improvement Project | 69 |
| Single Construction Permit | 24 |
| Demolition | 18 |
| Commercial / Multi Family Project | 14 |
| Environmental Restoration Permit | 4 |
| Label in the stored copy | Permits |
|---|---|
| New | 64 |
| Alteration | 35 |
| Demolition | 18 |
| Addition | 9 |
| Repair | 2 |
| Fire/ Security Alarm | 1 |
| Label in the stored copy | Permits |
|---|---|
| Residential | 108 |
| Unspecified | 17 |
| Non-Residential | 4 |
| Label in the stored copy | Permits |
|---|---|
| Issued Permit | 37 |
| Completed | 36 |
| Cancelled | 26 |
| Pre Backfill Phase | 13 |
| Pre Board Phase | 4 |
| Application Received | 3 |
| Expired | 3 |
| Hold | 3 |
| In Review | 2 |
| New | 1 |
| Pending Plans Review Assignment | 1 |
Reported cost estimates
72 of 129 stored permits include an estimated project cost. The average of those estimates is $211,091.46 and the sum is $15,198,585.19. Permits with a blank estimate are not in either figure.
Applications by month
Each row is the number of stored permits whose applied date falls in that month, for the last 24 months present in the copy. Applied in the last 12 months: 33. Applied in the previous 12 months: 54.
| Month | Applications |
|---|---|
| 2024-12 | 1 |
| 2025-01 | 7 |
| 2025-02 | 3 |
| 2025-03 | 1 |
| 2025-04 | 7 |
| 2025-05 | 6 |
| 2025-06 | 7 |
| 2025-07 | 4 |
| 2025-08 | 2 |
| 2025-09 | 5 |
| 2025-10 | 9 |
| 2025-11 | 2 |
| 2025-12 | 2 |
| 2026-01 | 2 |
| 2026-02 | 2 |
| 2026-03 | 1 |
| 2026-04 | 7 |
| 2026-06 | 1 |
| 2026-07 | 3 |
| 2026-08 | 4 |
| 2026-09 | 4 |
| 2026-10 | 5 |
Contractor names published in this community
| Name in the open data | Permits | Latest applied date |
|---|---|---|
| 2587346 AB | 4 | July 28, 2025 |
| INVICTO HOMES | 4 | October 31, 2025 |
| JJ HOMES | 4 | September 4, 2024 |
| REVERY CONSTRUCTION | 4 | September 15, 2025 |
| GRAVITY HOMES | 3 | October 17, 2025 |
| RAYNOW HOMES | 3 | April 3, 2025 |
| STRATUSHAVEN DEVELOPMENTS INC.. | 3 | March 25, 2008 |
| WESTERN ONE EXCAVATION | 3 | August 6, 2026 |
Recent permits
| Permit | Address | Work | Applied | Issued |
|---|---|---|---|---|
| BP2026-20631 Issued Permit | 381B HENDON DR NW | Demolition · Demolition | October 27, 2026 | October 30, 2026 |
| BP2026-20245 Hold | 44 HUNTER ST NW | Demolition · Demolition | October 21, 2026 | No issued date stored |
| BP2026-20014 Application Received | 719 44 AV NW | Fire/ Security Alarm · Commercial / Multi Family Project | October 19, 2026 | No issued date stored |
| BP2026-19916 Application Received | 52 HENDON DR NW | New · Residential Improvement Project Additional Dwelling Unit | October 16, 2026 | No issued date stored |
| BP2026-19034 Issued Permit | 36 HOLLY ST NW | Alteration · Residential Improvement Project Improvements | October 5, 2026 | October 19, 2026 |
| BP2026-18666 Application Received | #201B 4627 4 ST NW | New · Commercial / Multi Family Project | September 29, 2026 | No issued date stored |
| BP2026-18656 Pending Plans Review Assignment | #101R 4627 4 ST NW | New · Commercial / Multi Family Project | September 29, 2026 | No issued date stored |
| BP2026-17007 Pre Board Phase | 523B NORTHMOUNT DR NW | New · Single Construction Permit SFD,SSuite | September 4, 2026 | October 19, 2026 |
| BP2026-17006 Pre Board Phase | 521B NORTHMOUNT DR NW | New · Single Construction Permit SFD,SSuite | September 4, 2026 | October 19, 2026 |
| BP2026-15231 Pre Backfill Phase | 64 HOLLY ST NW | New · Single Construction Permit SFD,BSMT-DEV,GARAGE,SSuite | August 12, 2026 | August 21, 2026 |
| BP2026-15241 Pre Backfill Phase | 62 HOLLY ST NW | New · Single Construction Permit SFD,BSMT-DEV,GARAGE,SSuite | August 12, 2026 | August 21, 2026 |
| BP2026-14991 Issued Permit | 294 HENDON DR NW | New · Residential Improvement Project Garage | August 8, 2026 | November 2, 2026 |