Community
Kingsland building permits
Kingsland is listed in the City of Calgary open data as KINGSLAND (community code KIN). The sections below are calculated from the permit rows stored under that name.
Kingsland has 167 building permit records in CalgaryPermit's copy of the City of Calgary Building Permits open data. 114 have an issued date and 53 do not. These figures describe the rows stored on this site, not an official citywide total. The earliest applied date stored for this community is 2002-04-01 and the latest is 2026-10-26.
In the stored rows, the most common permit type label is Residential Improvement Project (90 records), and the most common work class is Alteration (82 records). Permit type is the City's project category. Work class says whether the job is new construction, an alteration, an addition, a repair, a demolition, or another label the feed uses. Read both with the permit class and the description on each record. A type label alone does not say whether the City has issued the permit.
An estimated project cost is filled in on 102 of 167 stored permits. The average of those reported estimates is $254,223.17 and the sum is $25,930,763.25. The City publishes estprojectcost as an estimate attached to the application. It is not a contract price, a final invoice, or a City assessment, and permits with a blank estimate are left out of both numbers.
Applications with an applied date in the last 12 months: 48. Applications with an applied date in the 12 months before that: 58. If the older window is small, the usual reason is that this site's copy does not go back that far for the community, not that the neighbourhood had no construction.
The contractor name published most often in this community's stored permits is CLOVERHILL CONSTRUCTION, on 5 permits. A repeated name is a clue that the company appears in the open data. It is not a City ranking, a licence check, or a count of crews on site. The same firm can be spelled more than one way, and a blank contractor name means the City did not publish one on that row.
Source: City of Calgary Open Data — Building Permits (dataset c2es-76ed). CalgaryPermit stores a copy of that feed and calculates the figures on this page from that copy. The City of Calgary is the publisher of the original file.
| Label in the stored copy | Permits |
|---|---|
| Residential Improvement Project | 90 |
| Commercial / Multi Family Project | 56 |
| Demolition | 20 |
| Environmental Restoration Permit | 1 |
| Label in the stored copy | Permits |
|---|---|
| Alteration | 82 |
| New | 53 |
| Demolition | 20 |
| Addition | 7 |
| Repair | 2 |
| Fire/ Security Alarm | 1 |
| Temporary | 1 |
| Unspecified | 1 |
| Label in the stored copy | Permits |
|---|---|
| Residential | 124 |
| Unspecified | 22 |
| Non-Residential | 21 |
| Label in the stored copy | Permits |
|---|---|
| Issued Permit | 66 |
| Completed | 45 |
| Cancelled | 32 |
| Hold | 12 |
| Refused | 4 |
| Pending Plans Review Assignment | 3 |
| Pending Plans Review | 2 |
| Application Received | 1 |
| New | 1 |
| Pending Prescreen Review | 1 |
Reported cost estimates
102 of 167 stored permits include an estimated project cost. The average of those estimates is $254,223.17 and the sum is $25,930,763.25. Permits with a blank estimate are not in either figure.
Applications by month
Each row is the number of stored permits whose applied date falls in that month, for the last 24 months present in the copy. Applied in the last 12 months: 48. Applied in the previous 12 months: 58.
| Month | Applications |
|---|---|
| 2024-12 | 5 |
| 2025-01 | 3 |
| 2025-02 | 3 |
| 2025-03 | 6 |
| 2025-04 | 12 |
| 2025-05 | 4 |
| 2025-06 | 5 |
| 2025-07 | 1 |
| 2025-08 | 4 |
| 2025-09 | 6 |
| 2025-10 | 9 |
| 2025-11 | 4 |
| 2025-12 | 3 |
| 2026-01 | 3 |
| 2026-02 | 1 |
| 2026-03 | 4 |
| 2026-04 | 4 |
| 2026-05 | 3 |
| 2026-06 | 6 |
| 2026-07 | 8 |
| 2026-08 | 5 |
| 2026-09 | 1 |
| 2026-10 | 6 |
Contractor names published in this community
| Name in the open data | Permits | Latest applied date |
|---|---|---|
| CLOVERHILL CONSTRUCTION | 5 | July 28, 2026 |
| EAGLE CREST CONSTRUCTION | 4 | July 28, 2025 |
| INNOFLEX ENGINEERING | 3 | September 19, 2024 |
| SAMDISHA HOMES | 3 | February 9, 2026 |
| THEO HOME RENOVATION | 3 | October 19, 2026 |
| WESTERN ONE EXCAVATION | 3 | May 7, 2025 |
| AAA WEST DEVELOPMENTS | 2 | August 4, 2025 |
| ARTISTIQUE HOMES | 2 | June 3, 2025 |
Recent permits
| Permit | Address | Work | Applied | Issued |
|---|---|---|---|---|
| BP2026-20577 Hold | 33 KENTISH DR SW | Alteration · Residential Improvement Project Improvements | October 26, 2026 | No issued date stored |
| BP2026-20273 Application Received | #100 7711 MACLEOD TR SW | Alteration · Commercial / Multi Family Project | October 22, 2026 | No issued date stored |
| BP2026-19985 Pending Plans Review | 623 75 AV SW | New · Residential Improvement Project Garage | October 19, 2026 | No issued date stored |
| BP2026-19764 New | 55 KELVIN PL SW | Alteration · Residential Improvement Project Improvements | October 15, 2026 | No issued date stored |
| BP2026-19711 Pending Plans Review | 623 75 AV SW | Alteration · Residential Improvement Project Secondary Suite | October 14, 2026 | No issued date stored |
| BP2026-19501 Issued Permit | 740 71 AV SW | Demolition · Demolition | October 9, 2026 | October 13, 2026 |
| BP2026-17070 Issued Permit | 619 69 AV SW | Alteration · Residential Improvement Project Improvements | September 5, 2026 | October 2, 2026 |
| BP2026-16205 Issued Permit | 604 69 AV SW | New · Residential Improvement Project Carport | August 25, 2026 | October 1, 2026 |
| BP2026-15830 Issued Permit | #430 7337 MACLEOD TR SW | Alteration · Commercial / Multi Family Project Interior Demolition | August 20, 2026 | September 10, 2026 |
| BP2026-15239 Hold | #2 912B 69 AV SW | New · Residential Improvement Project Secondary Suite | August 12, 2026 | September 9, 2026 |
| BP2026-15144 Issued Permit | 832 68 AV SW | Alteration · Residential Improvement Project Improvements | August 10, 2026 | September 16, 2026 |
| BP2026-14979 Issued Permit | 713R 68 AV SW | Alteration · Residential Improvement Project Secondary Suite | August 7, 2026 | September 22, 2026 |
How to read a single row: permit fields. Back to the community index.