Pump Hill is listed in the City of Calgary open data as PUMP HILL (community code PUM). The sections below are calculated from the permit rows stored under that name.
Pump Hill has 46 building permit records in CalgaryPermit's copy of the City of Calgary Building Permits open data. 29 have an issued date and 17 do not. These figures describe the rows stored on this site, not an official citywide total. The earliest applied date stored for this community is 2000-12-06 and the latest is 2026-09-16.
In the stored rows, the most common permit type label is Residential Improvement Project (35 records), and the most common work class is Alteration (29 records). Permit type is the City's project category. Work class says whether the job is new construction, an alteration, an addition, a repair, a demolition, or another label the feed uses. Read both with the permit class and the description on each record. A type label alone does not say whether the City has issued the permit.
An estimated project cost is filled in on 29 of 46 stored permits. The average of those reported estimates is $144,079.02 and the sum is $4,178,291.55. The City publishes estprojectcost as an estimate attached to the application. It is not a contract price, a final invoice, or a City assessment, and permits with a blank estimate are left out of both numbers.
Applications with an applied date in the last 12 months: 11. Applications with an applied date in the 12 months before that: 8. If the older window is small, the usual reason is that this site's copy does not go back that far for the community, not that the neighbourhood had no construction.
The contractor name published most often in this community's stored permits is HL CONTRACTING, on 2 permits. A repeated name is a clue that the company appears in the open data. It is not a City ranking, a licence check, or a count of crews on site. The same firm can be spelled more than one way, and a blank contractor name means the City did not publish one on that row.
Source: City of Calgary Open Data — Building Permits (dataset c2es-76ed). CalgaryPermit stores a copy of that feed and calculates the figures on this page from that copy. The City of Calgary is the publisher of the original file.
| Label in the stored copy | Permits |
|---|---|
| Residential Improvement Project | 35 |
| Commercial / Multi Family Project | 4 |
| Single Construction Permit | 4 |
| Demolition | 2 |
| Environmental Restoration Permit | 1 |
| Label in the stored copy | Permits |
|---|---|
| Alteration | 29 |
| Addition | 6 |
| New | 6 |
| Demolition | 2 |
| Fire/ Security Alarm | 2 |
| Repair | 1 |
| Label in the stored copy | Permits |
|---|---|
| Residential | 41 |
| Non-Residential | 3 |
| Unspecified | 2 |
| Label in the stored copy | Permits |
|---|---|
| Completed | 18 |
| Cancelled | 13 |
| Issued Permit | 11 |
| Hold | 2 |
| Pending Plans Review Assignment | 1 |
| Pre Backfill Phase | 1 |
Reported cost estimates
29 of 46 stored permits include an estimated project cost. The average of those estimates is $144,079.02 and the sum is $4,178,291.55. Permits with a blank estimate are not in either figure.
Applications by month
Each row is the number of stored permits whose applied date falls in that month, for the last 24 months present in the copy. Applied in the last 12 months: 11. Applied in the previous 12 months: 8.
| Month | Applications |
|---|---|
| 2024-12 | 1 |
| 2025-01 | 3 |
| 2025-06 | 1 |
| 2025-08 | 1 |
| 2025-09 | 2 |
| 2025-11 | 2 |
| 2026-01 | 1 |
| 2026-02 | 3 |
| 2026-04 | 1 |
| 2026-06 | 1 |
| 2026-08 | 1 |
| 2026-09 | 2 |
Contractor names published in this community
| Name in the open data | Permits | Latest applied date |
|---|---|---|
| HL CONTRACTING | 2 | February 26, 2026 |
| BILL SAFEHOUSE | 1 | June 1, 2020 |
| BLUE RIDGE EXCAVATING | 1 | April 14, 2026 |
| CEDRO FINE WOODWORK | 1 | October 23, 2024 |
| CHISHOLM INDUSTRIES | 1 | September 6, 2024 |
| CONCRETE CUTTING GEEKS | 1 | August 11, 2024 |
| DIAMOND FIREPLACE DISTRIBUTORS | 1 | January 7, 2026 |
| FIRST GENERAL SERVICES | 1 | October 18, 2024 |
Recent permits
| Permit | Address | Work | Applied | Issued |
|---|---|---|---|---|
| BP2026-17687 Issued Permit | 9824 19 ST SW | Alteration · Residential Improvement Project Improvements | September 16, 2026 | October 19, 2026 |
| BP2026-16949 Issued Permit | 123 PUMP HILL PL SW | Alteration · Residential Improvement Project Retaining Wall | September 3, 2026 | September 29, 2026 |
| BP2026-15366 Issued Permit | 135 PUMP HILL RD SW | Alteration · Residential Improvement Project Improvements | August 13, 2026 | August 31, 2026 |
| BP2026-10813 Pre Backfill Phase | 322 PUMPRIDGE PL SW | New · Single Construction Permit SFD,BSMT-DEV,FIREPLACE,GARAGE,PORCH, | June 12, 2026 | August 24, 2026 |
| BP2026-05939 Issued Permit | 1521 92 AV SW | Demolition · Demolition | April 14, 2026 | April 23, 2026 |
| BP2026-02998 Issued Permit | 105B PATTON CO SW | Alteration · Residential Improvement Project Secondary Suite | February 26, 2026 | April 8, 2026 |
| BP2026-02624 Issued Permit | 105 PATTON CO SW | Addition · Residential Improvement Project Addition | February 22, 2026 | September 22, 2026 |
| BP2026-01877 Issued Permit | 28 PUMP HILL LD SW | Alteration · Residential Improvement Project Improvements | February 7, 2026 | March 10, 2026 |
| BP2026-00212 Completed | 63 PUMPMEADOW CR SW | Alteration · Residential Improvement Project Fireplace | January 7, 2026 | January 16, 2026 |
| BP2025-21945 Issued Permit | 224 PUMP HILL CR SW | Addition · Residential Improvement Project Addition, Basement Dev, Porch, Improvements | November 12, 2025 | November 27, 2025 |
| BP2025-21624 Pending Plans Review Assignment | 9229 16 ST SW | Alteration · Commercial / Multi Family Project | November 6, 2025 | No issued date stored |
| BP2025-17299 Completed | 120 PUMP HILL PL SW | Alteration · Residential Improvement Project Hot Tub | September 4, 2025 | September 7, 2025 |
How to read a single row: permit fields. Back to the community index.