Community
St. Andrews Heights building permits
St. Andrews Heights is listed in the City of Calgary open data as ST. ANDREWS HEIGHTS (community code STA). The sections below are calculated from the permit rows stored under that name.
St. Andrews Heights has 107 building permit records in CalgaryPermit's copy of the City of Calgary Building Permits open data. 76 have an issued date and 31 do not. These figures describe the rows stored on this site, not an official citywide total. The earliest applied date stored for this community is 2000-12-06 and the latest is 2026-11-02.
In the stored rows, the most common permit type label is Commercial / Multi Family Project (43 records), and the most common work class is Alteration (45 records). Permit type is the City's project category. Work class says whether the job is new construction, an alteration, an addition, a repair, a demolition, or another label the feed uses. Read both with the permit class and the description on each record. A type label alone does not say whether the City has issued the permit.
An estimated project cost is filled in on 74 of 107 stored permits. The average of those reported estimates is $1,097,730.46 and the sum is $81,232,054.23. The City publishes estprojectcost as an estimate attached to the application. It is not a contract price, a final invoice, or a City assessment, and permits with a blank estimate are left out of both numbers.
Applications with an applied date in the last 12 months: 38. Applications with an applied date in the 12 months before that: 41. If the older window is small, the usual reason is that this site's copy does not go back that far for the community, not that the neighbourhood had no construction.
The contractor name published most often in this community's stored permits is ELLISDON CONSTRUCTION SERVICES, on 6 permits. A repeated name is a clue that the company appears in the open data. It is not a City ranking, a licence check, or a count of crews on site. The same firm can be spelled more than one way, and a blank contractor name means the City did not publish one on that row.
Source: City of Calgary Open Data — Building Permits (dataset c2es-76ed). CalgaryPermit stores a copy of that feed and calculates the figures on this page from that copy. The City of Calgary is the publisher of the original file.
| Label in the stored copy | Permits |
|---|---|
| Commercial / Multi Family Project | 43 |
| Residential Improvement Project | 37 |
| Single Construction Permit | 16 |
| Demolition | 11 |
| Label in the stored copy | Permits |
|---|---|
| Alteration | 45 |
| New | 35 |
| Demolition | 11 |
| Addition | 10 |
| Fire/ Security Alarm | 4 |
| Repair | 2 |
| Label in the stored copy | Permits |
|---|---|
| Residential | 58 |
| Non-Residential | 39 |
| Unspecified | 10 |
| Label in the stored copy | Permits |
|---|---|
| Issued Permit | 38 |
| Completed | 26 |
| Cancelled | 20 |
| Pre Backfill Phase | 10 |
| Pending Plans Review Assignment | 4 |
| New | 3 |
| Application Received | 2 |
| Hold | 2 |
| Expired | 1 |
| Pre Board Phase | 1 |
Reported cost estimates
74 of 107 stored permits include an estimated project cost. The average of those estimates is $1,097,730.46 and the sum is $81,232,054.23. Permits with a blank estimate are not in either figure.
Applications by month
Each row is the number of stored permits whose applied date falls in that month, for the last 24 months present in the copy. Applied in the last 12 months: 38. Applied in the previous 12 months: 41.
| Month | Applications |
|---|---|
| 2024-12 | 5 |
| 2025-01 | 2 |
| 2025-02 | 4 |
| 2025-03 | 7 |
| 2025-04 | 3 |
| 2025-05 | 2 |
| 2025-06 | 4 |
| 2025-07 | 4 |
| 2025-08 | 4 |
| 2025-09 | 2 |
| 2025-10 | 1 |
| 2025-11 | 2 |
| 2025-12 | 2 |
| 2026-01 | 1 |
| 2026-02 | 5 |
| 2026-03 | 3 |
| 2026-04 | 1 |
| 2026-05 | 1 |
| 2026-06 | 3 |
| 2026-07 | 5 |
| 2026-08 | 7 |
| 2026-09 | 1 |
| 2026-10 | 5 |
| 2026-11 | 2 |
Contractor names published in this community
| Name in the open data | Permits | Latest applied date |
|---|---|---|
| ELLISDON CONSTRUCTION SERVICES | 6 | February 11, 2026 |
| PCL CONSTRUCTION MANAGEMENT | 5 | August 31, 2026 |
| FOUR CORNERS CONTRACTING | 4 | December 12, 2025 |
| RECTANGLE DESIGN | 4 | July 14, 2026 |
| IMPACT CONSTRUCTION | 3 | October 2, 2026 |
| SNAP BUILDING | 3 | July 11, 2025 |
| BLOK HOME DEVELOPMENT AND DESIGN | 2 | March 31, 2025 |
| CALTON DEVELOPMENTS | 2 | August 19, 2026 |
Recent permits
| Permit | Address | Work | Applied | Issued |
|---|---|---|---|---|
| BP2026-21028 New | 2807 13 AV NW | New · Single Construction Permit SFD,BSMT-DEV,FIREPLACE,DECK, | November 2, 2026 | No issued date stored |
| BP2026-21029 New | 2807 13 AV NW | New · Residential Improvement Project Garage | November 2, 2026 | No issued date stored |
| BP2026-19969 Issued Permit | 2807 13 AV NW | Demolition · Demolition | October 19, 2026 | October 21, 2026 |
| BP2026-19844 Application Received | 1331 29 ST NW | Alteration · Commercial / Multi Family Project | October 16, 2026 | No issued date stored |
| BP2026-19655 Application Received | 3310 HOSPITAL DR NW | Alteration · Commercial / Multi Family Project | October 14, 2026 | No issued date stored |
| BP2026-18967 Pending Plans Review Assignment | #600 1403 29 ST NW | Alteration · Commercial / Multi Family Project | October 2, 2026 | No issued date stored |
| BP2026-18980 Pending Plans Review Assignment | 1441 29 ST NW | Alteration · Commercial / Multi Family Project | October 2, 2026 | No issued date stored |
| BP2026-17546 Issued Permit | 2919 12 AV NW | Alteration · Residential Improvement Project Hot Tub | September 14, 2026 | September 23, 2026 |
| BP2026-16565 Issued Permit | 2529 12 AV NW | Addition · Residential Improvement Project Addition, Basement Dev, Garage, Fireplace | August 31, 2026 | October 15, 2026 |
| BP2026-16580 Issued Permit | #900 1403 29 ST NW | Alteration · Commercial / Multi Family Project Interior alterations | August 31, 2026 | September 28, 2026 |
| BP2026-15852 Issued Permit | 2607 12 AV NW | Demolition · Demolition | August 20, 2026 | August 21, 2026 |
| BP2026-15812 Pre Backfill Phase | 2607 12 AV NW | New · Single Construction Permit SFD,BSMT-DEV,FIREPLACE,GARAGE,PORCH, | August 19, 2026 | September 23, 2026 |