Community
Tuxedo Park building permits
Tuxedo Park is listed in the City of Calgary open data as TUXEDO PARK (community code TUX). The sections below are calculated from the permit rows stored under that name.
Tuxedo Park has 308 building permit records in CalgaryPermit's copy of the City of Calgary Building Permits open data. 193 have an issued date and 115 do not. These figures describe the rows stored on this site, not an official citywide total. The earliest applied date stored for this community is 1999-09-30 and the latest is 2026-11-02.
In the stored rows, the most common permit type label is Residential Improvement Project (105 records), and the most common work class is New (143 records). Permit type is the City's project category. Work class says whether the job is new construction, an alteration, an addition, a repair, a demolition, or another label the feed uses. Read both with the permit class and the description on each record. A type label alone does not say whether the City has issued the permit.
An estimated project cost is filled in on 151 of 308 stored permits. The average of those reported estimates is $579,849.36 and the sum is $87,557,253.37. The City publishes estprojectcost as an estimate attached to the application. It is not a contract price, a final invoice, or a City assessment, and permits with a blank estimate are left out of both numbers.
Applications with an applied date in the last 12 months: 91. Applications with an applied date in the 12 months before that: 106. If the older window is small, the usual reason is that this site's copy does not go back that far for the community, not that the neighbourhood had no construction.
The contractor name published most often in this community's stored permits is CLOVERHILL CONSTRUCTION, on 13 permits. A repeated name is a clue that the company appears in the open data. It is not a City ranking, a licence check, or a count of crews on site. The same firm can be spelled more than one way, and a blank contractor name means the City did not publish one on that row.
Source: City of Calgary Open Data — Building Permits (dataset c2es-76ed). CalgaryPermit stores a copy of that feed and calculates the figures on this page from that copy. The City of Calgary is the publisher of the original file.
| Label in the stored copy | Permits |
|---|---|
| Residential Improvement Project | 105 |
| Commercial / Multi Family Project | 88 |
| Demolition | 72 |
| Single Construction Permit | 42 |
| Environmental Restoration Permit | 1 |
| Label in the stored copy | Permits |
|---|---|
| New | 143 |
| Alteration | 78 |
| Demolition | 72 |
| Addition | 6 |
| Unspecified | 5 |
| Fire/ Security Alarm | 3 |
| Repair | 1 |
| Label in the stored copy | Permits |
|---|---|
| Residential | 219 |
| Unspecified | 58 |
| Non-Residential | 31 |
| Label in the stored copy | Permits |
|---|---|
| Completed | 89 |
| Issued Permit | 88 |
| Cancelled | 81 |
| Pre Backfill Phase | 11 |
| New | 10 |
| Pending Plans Review Assignment | 6 |
| In Review | 4 |
| Pre Board Phase | 4 |
| Refused | 4 |
| Expired | 3 |
| Hold | 3 |
| Application Received | 2 |
| Pending Prescreen Review | 2 |
| Hold - Pending Plans Review | 1 |
Reported cost estimates
151 of 308 stored permits include an estimated project cost. The average of those estimates is $579,849.36 and the sum is $87,557,253.37. Permits with a blank estimate are not in either figure.
Applications by month
Each row is the number of stored permits whose applied date falls in that month, for the last 24 months present in the copy. Applied in the last 12 months: 91. Applied in the previous 12 months: 106.
| Month | Applications |
|---|---|
| 2024-12 | 5 |
| 2025-01 | 9 |
| 2025-02 | 5 |
| 2025-03 | 9 |
| 2025-04 | 8 |
| 2025-05 | 6 |
| 2025-06 | 16 |
| 2025-07 | 8 |
| 2025-08 | 20 |
| 2025-09 | 12 |
| 2025-10 | 1 |
| 2025-11 | 4 |
| 2025-12 | 14 |
| 2026-01 | 3 |
| 2026-02 | 7 |
| 2026-03 | 16 |
| 2026-04 | 13 |
| 2026-05 | 3 |
| 2026-06 | 2 |
| 2026-07 | 9 |
| 2026-08 | 8 |
| 2026-09 | 7 |
| 2026-10 | 4 |
| 2026-11 | 2 |
Contractor names published in this community
| Name in the open data | Permits | Latest applied date |
|---|---|---|
| CLOVERHILL CONSTRUCTION | 13 | October 23, 2026 |
| ALLURING HOMES | 10 | April 9, 2026 |
| ACE HOMES | 8 | October 3, 2023 |
| GOOD EARTH BUILDERS | 5 | September 8, 2026 |
| ARBUS HOMES | 4 | September 28, 2017 |
| B2 BUILD | 4 | March 9, 2026 |
| BJK MANAGEMENT | 4 | June 12, 2025 |
| DHILLON CONSTRUCTION | 4 | August 31, 2026 |
Recent permits
| Permit | Address | Work | Applied | Issued |
|---|---|---|---|---|
| BP2026-20999 New | 129 18 AV NW | New · Residential Improvement Project Garage | November 2, 2026 | No issued date stored |
| BP2026-20998 New | 129 18 AV NW | New · Single Construction Permit SFD,BSMT-DEV,FIREPLACE,DECK,PORCH, | November 2, 2026 | No issued date stored |
| BP2026-20824 In Review | 129 18 AV NW | Demolition · Demolition | October 29, 2026 | No issued date stored |
| BP2026-20446 In Review | 1922B 1 ST NW | Demolition · Demolition | October 23, 2026 | No issued date stored |
| BP2026-19911 Application Received | 320A 30 AV NE | New · Commercial / Multi Family Project | October 16, 2026 | No issued date stored |
| BP2026-19579 In Review | 112 30 AV NE | New · Residential Improvement Project Additional Dwelling Unit | October 13, 2026 | No issued date stored |
| BP2026-18828 Issued Permit | 230 30 AV NW | Alteration · Residential Improvement Project Improvements | September 30, 2026 | October 29, 2026 |
| BP2026-18593 Issued Permit | 202B 23 AV NW | Demolition · Demolition | September 28, 2026 | October 1, 2026 |
| BP2026-18292 Issued Permit | #12 2811 CENTRE ST NW | Demolition · Demolition | September 24, 2026 | October 8, 2026 |
| BP2026-18221 Issued Permit | 230 30 AV NW | Alteration · Residential Improvement Project Basement Dev | September 23, 2026 | October 5, 2026 |
| BP2026-18166 Issued Permit | 109 19 AV NE | Demolition · Demolition | September 22, 2026 | September 25, 2026 |
| BP2026-17264 Issued Permit | #215 222 16 AV NE | Alteration · Commercial / Multi Family Project Interior move-in only. No construction | September 9, 2026 | October 21, 2026 |
How to read a single row: permit fields. Back to the community index.