BP2026-16595
Improvements
80 OAKMOUNT WY SW in OAKRIDGE. Status on the stored row: Issued Permit.
Dates
- Applied
- August 31, 2026
- Issued
- September 23, 2026
- Completed
- No completed date is stored
Applied is when the application was recorded. Issued is when the City issued the permit. Completed is when the file was marked completed. A missing issued date is not the same thing as a refused file. Read the status, and see how those labels relate to the dates.
What the classification says
Permit type: Residential Improvement Project (mapped as Building). Permit class: 1101 - Improvements (Single Family), group Single Family, mapped as Residential. Work class: Alteration, group Improvement.
The type is the application stream, the class is the subject of the file, and the work class says whether the job is new work, an alteration, an addition, a repair, a demolition, or another label. The permit type guide explains why those are three different questions.
Description published with the file: Improvements.
Cost, size, and names
Estimated project cost: $30,000.00. That figure is the estimate published with the permit, not a contract price or an assessment.
Housing units: 0. Total square feet: not stored.
Contractor name published by the City: BIG AL'S TEXTURING. Applicant name published by the City: BIG AL'S TEXTURING. A blank name means the open data did not include one.
Where this sits
Community: OAKRIDGE (code OAK).
Source: City of Calgary Open Data — Building Permits (dataset c2es-76ed). CalgaryPermit stores a copy of that feed and calculates the figures on this page from that copy. The City of Calgary is the publisher of the original file.